Patriot General Engineering, Inc.

Projects: Rosamond BESS

PROJECT DETAILS

Patriot General Engineering, Inc. was proud to be part of a cutting-edge Battery Energy Storage System (BESS) project in Kern County, California. This transformative energy initiative was being developed in collaboration with a team of experienced contracting partners and will to play a key role in supporting California’s transition to a more sustainable and resilient power grid.

ROSAMOND CENTRAL BESS

Project Completed: 2025

Project Location: Kern County, CA

The project utilized the following Patriot General capabilities:

Mobilization and Demobilization
Ensuring a smooth setup and breakdown of equipment, materials, and personnel—Patriot’s field operations are built for speed, safety, and efficiency, minimizing disruption while keeping timelines on track.

Conduit Trenching and Backfill
The installation of underground conduit systems is vital for safe and reliable power and communication routing. Our crews are precision-focused, using best practices to trench, place conduit, and backfill to specification.

Grounding Trenching and Backfill
Proper grounding is critical for the safe operation of electrical infrastructure. Patriot is installing robust grounding systems to protect the BESS facility and support its long-term operational integrity.

Share

Share on Facebook
Share on LinkedIn
Share on Twitter
Share on Reddit
Share via Email
Print